What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Burnham-on-Sea?
In Burnham-on-Sea, a small housing development typically costs £1,850–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £740,000–£1,100,000. Prices in the South West sit near the national average for this kind of work, and the range for Burnham-on-Sea reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £518,000–£770,000 |
| Typical project (400 m²) | £740,000–£1,100,000 |
| Larger project (560 m²) | £1,036,000–£1,540,000 |
| Rate per m² | £1,850–£2,750 |
The main things that change the cost:
- Site access and phasing
- Planning conditions and obligations
- Specification
- Number and size of homes
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Burnham-on-Sea?
Here is how the rules work for a small housing development in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a small housing development:
- Handover packs for each home
- Groundworks, roads and drainage
- Design development and discharge of conditions
- Warranty and building control inspections
- House construction to building regulations
- Pre-construction cost plan
How long does it take?
Expect 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Burnham-on-Sea
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Our Burnham-on-Sea coverage includes postcode districts TA8, and we also work in nearby places such as Weston-super-Mare, Bridgwater and Clevedon.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Burnham-on-Sea
How much does a small housing development cost in Burnham-on-Sea?
In Burnham-on-Sea, a small housing development typically costs £1,850–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £740,000–£1,100,000. Your fixed price depends on the survey and drawings.
How long does a small housing development take in Burnham-on-Sea?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.
What about biodiversity net gain?
In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
