What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Chiswick?
In Chiswick, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £940,000–£1,400,000. Building costs in London run about 30% above the UK average, and the figures for Chiswick are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £658,000–£980,000 |
| Typical project (400 m²) | £940,000–£1,400,000 |
| Larger project (560 m²) | £1,316,000–£1,960,000 |
| Rate per m² | £2,350–£3,500 |
What moves the price most:
- Roads, sewers and adoption agreements
- Ground conditions
- Number and size of homes
- Planning conditions and obligations
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Chiswick?
Here is how the rules work for a small housing development in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical small housing development we handle:
- Warranty and building control inspections
- House construction to building regulations
- Groundworks, roads and drainage
- Handover packs for each home
- External works and landscaping
- Design development and discharge of conditions
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Chiswick
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Projects in Chiswick (W4) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Chiswick
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Who approves a small housing development in Chiswick?
Planning matters in Chiswick go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a small housing development cost in Chiswick?
In Chiswick, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £940,000–£1,400,000. Your fixed price depends on the survey and drawings.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.