What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Erskine?
In Erskine, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Prices in Scotland sit near the national average for this kind of work, and the range for Erskine reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
Your quote will depend mainly on:
- Planning conditions and obligations
- Ground conditions
- Site access and phasing
- Number and size of homes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Erskine?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical small housing development we handle:
- Utility connections
- Design development and discharge of conditions
- Groundworks, roads and drainage
- External works and landscaping
- Pre-construction cost plan
- House construction to building regulations
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Erskine
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
If your home is in Erskine or close by in Clydebank, Renfrew and Bearsden, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Erskine
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
How much does a small housing development cost in Erskine?
In Erskine, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Erskine?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Who approves a small housing development in Erskine?
Planning matters in Erskine go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.