What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Greenwich?
In Greenwich, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £940,000–£1,400,000. We start from a UK-wide guide and adjust it for London, where labour and materials are typically about 30% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £658,000–£980,000 |
| Typical project (400 m²) | £940,000–£1,400,000 |
| Larger project (560 m²) | £1,316,000–£1,960,000 |
| Rate per m² | £2,350–£3,500 |
The biggest cost drivers are:
- Planning conditions and obligations
- Specification
- Number and size of homes
- Roads, sewers and adoption agreements
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Greenwich?
Whether you need planning permission depends on your house and its location in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most small housing developments:
- External works and landscaping
- Design development and discharge of conditions
- House construction to building regulations
- Pre-construction cost plan
- Handover packs for each home
- Warranty and building control inspections
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in Greenwich
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
Our Greenwich coverage includes postcode districts SE10, and we also work in nearby places such as Blackheath, Lewisham and Catford.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Greenwich
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Who approves a small housing development in Greenwich?
Planning matters in Greenwich go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a small housing development cost in Greenwich?
In Greenwich, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £940,000–£1,400,000. Your fixed price depends on the survey and drawings.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
