What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Halifax?
In Halifax, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £660,000–£1,000,000. The guide for Halifax reflects typical costs in Yorkshire and the Humber, roughly 7% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £462,000–£700,000 |
| Typical project (400 m²) | £660,000–£1,000,000 |
| Larger project (560 m²) | £924,000–£1,400,000 |
| Rate per m² | £1,650–£2,500 |
What moves the price most:
- Planning conditions and obligations
- Site access and phasing
- Number and size of homes
- Specification
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in Halifax?
Before anything is built in Halifax, we confirm which approvals apply in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most small housing developments:
- Warranty and building control inspections
- External works and landscaping
- Handover packs for each home
- Pre-construction cost plan
- House construction to building regulations
- Design development and discharge of conditions
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Halifax
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
Our Halifax coverage includes postcode districts HX1, and we also work in nearby places such as Brighouse, Huddersfield and Cleckheaton.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Halifax
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
How much does a small housing development cost in Halifax?
In Halifax, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £660,000–£1,000,000. Your fixed price depends on the survey and drawings.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How long does a small housing development take in Halifax?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.