What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Holyhead?
In Holyhead, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £660,000–£1,000,000. The guide for Holyhead reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £462,000–£700,000 |
| Typical project (400 m²) | £660,000–£1,000,000 |
| Larger project (560 m²) | £924,000–£1,400,000 |
| Rate per m² | £1,650–£2,500 |
What moves the price most:
- Roads, sewers and adoption agreements
- Number and size of homes
- Site access and phasing
- Planning conditions and obligations
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in Holyhead?
Whether you need planning permission depends on your house and its location in Wales. In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical small housing development we handle:
- Pre-construction cost plan
- Design development and discharge of conditions
- Warranty and building control inspections
- Utility connections
- House construction to building regulations
- Groundworks, roads and drainage
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Holyhead
Wales has many terraced valley streets, stone cottages and post-war estates, so extension designs are shaped by slopes, materials and local character.
Our Holyhead coverage includes postcode districts LL65, and we also work in nearby places such as Caernarfon, Bangor and Llandudno.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Holyhead
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
How much does a small housing development cost in Holyhead?
In Holyhead, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £660,000–£1,000,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Holyhead?
In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How long does a small housing development take in Holyhead?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.