What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Kilwinning?
In Kilwinning, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Building costs in Scotland are close to the UK average, so the figures for Kilwinning are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
The biggest cost drivers are:
- Ground conditions
- Specification
- Site access and phasing
- Planning conditions and obligations
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a small housing development in Kilwinning?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Pre-construction cost plan
- Design development and discharge of conditions
- Warranty and building control inspections
- Handover packs for each home
- Utility connections
- External works and landscaping
How long does it take?
Build time is typically 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Kilwinning
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
From KA13 outwards, we take on projects throughout Kilwinning and the surrounding parts of Ayrshire.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Kilwinning
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
Do you build small housing developments in Kilwinning?
Yes. We build small housing developments across Kilwinning, including postcodes KA13. Every project starts with a free home visit.
How much does a small housing development cost in Kilwinning?
In Kilwinning, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a small housing development in Kilwinning?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
