What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Maidenhead?
In Maidenhead, a small housing development typically costs £2,000–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £800,000–£1,200,000. We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £560,000–£840,000 |
| Typical project (400 m²) | £800,000–£1,200,000 |
| Larger project (560 m²) | £1,120,000–£1,680,000 |
| Rate per m² | £2,000–£3,000 |
Your quote will depend mainly on:
- Ground conditions
- Number and size of homes
- Roads, sewers and adoption agreements
- Planning conditions and obligations
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Maidenhead?
Before anything is built in Maidenhead, we confirm which approvals apply in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a small housing development:
- House construction to building regulations
- Utility connections
- Handover packs for each home
- Groundworks, roads and drainage
- External works and landscaping
- Pre-construction cost plan
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Maidenhead
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Our Maidenhead coverage includes postcode districts SL6, and we also work in nearby places such as Marlow, Slough and Windsor.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Maidenhead
How much does a small housing development cost in Maidenhead?
In Maidenhead, a small housing development typically costs £2,000–£3,000 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £800,000–£1,200,000. Your fixed price depends on the survey and drawings.
What about biodiversity net gain?
In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Who approves a small housing development in Maidenhead?
Planning matters in Maidenhead go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.