What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Oadby?
In Oadby, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £680,000–£1,020,000. Prices across the East Midlands are typically 5% below the UK average for this kind of work, which is reflected in the range for Oadby. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £476,000–£714,000 |
| Typical project (400 m²) | £680,000–£1,020,000 |
| Larger project (560 m²) | £952,000–£1,428,000 |
| Rate per m² | £1,700–£2,550 |
What moves the price most:
- Specification
- Site access and phasing
- Planning conditions and obligations
- Ground conditions
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Oadby?
The approval route for Oadby is set by planning law in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- House construction to building regulations
- External works and landscaping
- Design development and discharge of conditions
- Handover packs for each home
- Warranty and building control inspections
- Groundworks, roads and drainage
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Oadby
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
From LE2 outwards, we take on projects throughout Oadby and the surrounding parts of Leicestershire.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Oadby
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
How much does a small housing development cost in Oadby?
In Oadby, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £680,000–£1,020,000. Your fixed price depends on the survey and drawings.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
What about biodiversity net gain?
In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.
How long does a small housing development take in Oadby?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.