What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Orpington?
In Orpington, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £940,000–£1,400,000. The guide for Orpington reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £658,000–£980,000 |
| Typical project (400 m²) | £940,000–£1,400,000 |
| Larger project (560 m²) | £1,316,000–£1,960,000 |
| Rate per m² | £2,350–£3,500 |
The main things that change the cost:
- Specification
- Site access and phasing
- Roads, sewers and adoption agreements
- Number and size of homes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Orpington?
Before anything is built in Orpington, we confirm which approvals apply in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most small housing developments:
- External works and landscaping
- Utility connections
- Pre-construction cost plan
- House construction to building regulations
- Warranty and building control inspections
- Groundworks, roads and drainage
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Orpington
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
From BR6 outwards, we take on projects throughout Orpington and the surrounding parts of Greater London.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in Orpington
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How much does a small housing development cost in Orpington?
In Orpington, a small housing development typically costs £2,350–£3,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £940,000–£1,400,000. Your fixed price depends on the survey and drawings.
Who approves a small housing development in Orpington?
Planning matters in Orpington go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.