What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Perth?
In Perth, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £700,000–£1,040,000. Building costs in Scotland are close to the UK average, so the figures for Perth are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £490,000–£728,000 |
| Typical project (400 m²) | £700,000–£1,040,000 |
| Larger project (560 m²) | £980,000–£1,456,000 |
| Rate per m² | £1,750–£2,600 |
Your quote will depend mainly on:
- Ground conditions
- Roads, sewers and adoption agreements
- Number and size of homes
- Site access and phasing
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in Perth?
Here is how the rules work for a small housing development in Scotland. In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical small housing development we handle:
- Design development and discharge of conditions
- Pre-construction cost plan
- Utility connections
- Warranty and building control inspections
- House construction to building regulations
- Handover packs for each home
How long does it take?
Expect 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.
Building in Perth
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Our Perth coverage includes postcode districts PH1, and we also work in nearby places such as Cupar, Glenrothes and Dundee.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about small housing developments in Perth
Do I need planning permission for a small housing development in Perth?
In Scotland small schemes need planning permission, building warrants for each home and, where new roads are built, roads construction consent.
How much does a small housing development cost in Perth?
In Perth, a small housing development typically costs £1,750–£2,600 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £700,000–£1,040,000. Your fixed price depends on the survey and drawings.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
Do you build small housing developments in Perth?
Yes. We build small housing developments across Perth, including postcodes PH1. Every project starts with a free home visit.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
