What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Poole?
In Poole, a small housing development typically costs £1,850–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £740,000–£1,100,000. Building costs in the South West are close to the UK average, so the figures for Poole are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £518,000–£770,000 |
| Typical project (400 m²) | £740,000–£1,100,000 |
| Larger project (560 m²) | £1,036,000–£1,540,000 |
| Rate per m² | £1,850–£2,750 |
The main things that change the cost:
- Site access and phasing
- Ground conditions
- Specification
- Planning conditions and obligations
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a small housing development in Poole?
Before anything is built in Poole, we confirm which approvals apply in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most small housing developments:
- Handover packs for each home
- Warranty and building control inspections
- Design development and discharge of conditions
- External works and landscaping
- Pre-construction cost plan
- Groundworks, roads and drainage
How long does it take?
Expect 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Poole
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Projects in Poole (BH15) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Poole
What about biodiversity net gain?
In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.
Can you help with planning?
Yes. We coordinate the architect or designer and, where needed, a planning consultant.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How much does a small housing development cost in Poole?
In Poole, a small housing development typically costs £1,850–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £740,000–£1,100,000. Your fixed price depends on the survey and drawings.
How long does a small housing development take in Poole?
Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.