SK Developments Free home visit0800 088 6248 Get a quote

EnglandSmall housing developments

Small housing developments in Rutland

SK Developments designs and builds small housing developments across Rutland, including Oakham. One contract covers the drawings, approvals and the build.

Guide price in Rutland

£1,700–£2,550 per m² of floor area (build cost)

In Rutland, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £680,000–£1,020,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a small housing development?

Small development of brick semi-detached houses around a block-paved cul-de-sac

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.

How much does a small housing development cost in Rutland?

In Rutland, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £680,000–£1,020,000. Prices across the East Midlands are typically 5% below the UK average for this kind of work, which is reflected in the range for Rutland. Design, structural calculations and council fees are extra.

Guide prices for Rutland, including VAT at 0% (zero-rated for qualifying new dwellings)
Size or typeGuide range
Smaller project (280 m²)£476,000–£714,000
Typical project (400 m²)£680,000–£1,020,000
Larger project (560 m²)£952,000–£1,428,000
Rate per m²£1,700–£2,550

The main things that change the cost:

  • Site access and phasing
  • Ground conditions
  • Specification
  • Roads, sewers and adoption agreements

Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.

Do you need planning permission for a small housing development in Rutland?

Whether you need planning permission depends on your house and its location in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

What we take care of:

  • Utility connections
  • Handover packs for each home
  • Design development and discharge of conditions
  • External works and landscaping
  • Pre-construction cost plan
  • House construction to building regulations

How long does it take?

Allow 12 to 24 months depending on scheme size. Design and approvals come first and typically take 6 to 12 months, depending on the approval route.

Building in Rutland

In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.

Towns we cover in Rutland include Oakham.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about small housing developments in Rutland

How much does a small housing development cost in Rutland?

In Rutland, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £680,000–£1,020,000. Your fixed price depends on the survey and drawings.

What about biodiversity net gain?

In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.

How long does a small housing development take in Rutland?

Typically 12 to 24 months depending on scheme size. Design and approvals beforehand usually take 6 to 12 months.

Can you help with planning?

Yes. We coordinate the architect or designer and, where needed, a planning consultant.

Is VAT charged on new homes?

Construction of qualifying new dwellings is normally zero-rated for VAT.

Small housing developments in towns across Rutland

Ready to talk about a small housing development in Rutland? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price