What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in South Glamorgan?
In South Glamorgan, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £660,000–£1,000,000. The guide for South Glamorgan reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £462,000–£700,000 |
| Typical project (400 m²) | £660,000–£1,000,000 |
| Larger project (560 m²) | £924,000–£1,400,000 |
| Rate per m² | £1,650–£2,500 |
Your quote will depend mainly on:
- Number and size of homes
- Planning conditions and obligations
- Roads, sewers and adoption agreements
- Specification
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a small housing development in South Glamorgan?
Before anything is built in South Glamorgan, we confirm which approvals apply in Wales. In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most small housing developments:
- External works and landscaping
- Groundworks, roads and drainage
- Utility connections
- Pre-construction cost plan
- Warranty and building control inspections
- Design development and discharge of conditions
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in South Glamorgan
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Towns we cover in South Glamorgan include Cardiff, Barry and Penarth.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about small housing developments in South Glamorgan
Do I need planning permission for a small housing development in South Glamorgan?
In Wales small schemes need full planning permission and, for most new buildings, sustainable drainage approval from the SuDS approval body. New homes must have sprinklers.
Who handles road adoption?
We build roads and sewers to adoptable standards where agreements are in place with the highway authority and water company.
Who approves a small housing development in South Glamorgan?
Planning matters in South Glamorgan go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
How much does a small housing development cost in South Glamorgan?
In South Glamorgan, a small housing development typically costs £1,650–£2,500 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £660,000–£1,000,000. Your fixed price depends on the survey and drawings.