What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Staveley?
In Staveley, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £680,000–£1,020,000. That range is adjusted for the East Midlands, where domestic building work typically costs around 5% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £476,000–£714,000 |
| Typical project (400 m²) | £680,000–£1,020,000 |
| Larger project (560 m²) | £952,000–£1,428,000 |
| Rate per m² | £1,700–£2,550 |
The biggest cost drivers are:
- Site access and phasing
- Specification
- Ground conditions
- Planning conditions and obligations
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a small housing development in Staveley?
Approvals for a small housing development in Staveley follow the rules for England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Warranty and building control inspections
- Pre-construction cost plan
- Design development and discharge of conditions
- Utility connections
- House construction to building regulations
- External works and landscaping
How long does it take?
The build itself usually takes 12 to 24 months depending on scheme size. Before that, surveys, drawings and approvals usually take 6 to 12 months, longer if the council asks for changes.
Building in Staveley
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
Our Staveley coverage includes postcode districts S43, and we also work in nearby places such as Chesterfield, Dronfield and Dinnington.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Staveley
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.
Who approves a small housing development in Staveley?
Planning matters in Staveley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a small housing development cost in Staveley?
In Staveley, a small housing development typically costs £1,700–£2,550 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £680,000–£1,020,000. Your fixed price depends on the survey and drawings.
Is VAT charged on new homes?
Construction of qualifying new dwellings is normally zero-rated for VAT.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.