What is a small housing development?

A small housing development is a scheme of a few new homes, typically two to nine, on a single site. We work with landowners, small developers and investors to build schemes that already have planning permission, or help take a site through planning first.
How much does a small housing development cost in Tewkesbury?
In Tewkesbury, a small housing development typically costs £1,850–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 400 m² project that is roughly £740,000–£1,100,000. Prices in the South West sit near the national average for this kind of work, and the range for Tewkesbury reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (280 m²) | £518,000–£770,000 |
| Typical project (400 m²) | £740,000–£1,100,000 |
| Larger project (560 m²) | £1,036,000–£1,540,000 |
| Rate per m² | £1,850–£2,750 |
The biggest cost drivers are:
- Ground conditions
- Specification
- Planning conditions and obligations
- Number and size of homes
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a small housing development in Tewkesbury?
Before anything is built in Tewkesbury, we confirm which approvals apply in England. In England small schemes need full planning permission and may involve a section 106 agreement, the Community Infrastructure Levy, highways and drainage approvals, and biodiversity net gain where it applies.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most small housing developments:
- Design development and discharge of conditions
- Warranty and building control inspections
- External works and landscaping
- Pre-construction cost plan
- House construction to building regulations
- Utility connections
How long does it take?
Allow 12 to 24 months depending on scheme size. Allow time beforehand for drawings and approvals, usually 6 to 12 months.
Building in Tewkesbury
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
We work across Tewkesbury and neighbouring areas such as Cheltenham, Gloucester and Great Malvern. Postcodes we cover in Tewkesbury include GL20.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about small housing developments in Tewkesbury
What about biodiversity net gain?
In England, biodiversity net gain rules apply to many developments, with exemptions for some small sites. We work with your ecologist to confirm what applies to your scheme.
Do you build small housing developments in Tewkesbury?
Yes. We build small housing developments across Tewkesbury, including postcodes GL20. Every project starts with a free home visit.
Do you work with landowners?
Yes. If you own land, with or without planning permission, we can discuss building on it with you.
How much does a small housing development cost in Tewkesbury?
In Tewkesbury, a small housing development typically costs £1,850–£2,750 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 400 m² project comes to roughly £740,000–£1,100,000. Your fixed price depends on the survey and drawings.
How long does a small development take?
Typically 12 to 24 months on site, depending on size and phasing.