What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Bedworth?
In Bedworth, a structural alteration typically costs £4,250–£9,250 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Building costs in the West Midlands are close to the UK average, so the figures for Bedworth are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £4,250–£9,250 |
| Higher specification | £9,250–£11,500 |
The biggest cost drivers are:
- Span of the opening
- Flush or downstand beam
- Moving radiators, sockets and pipes
- Floor and ceiling repairs
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a structural alteration in Bedworth?
Whether you need planning permission depends on your house and its location in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most structural alterations:
- Structural engineer’s calculations and drawings
- Building control sign-off
- Building control application
- Party wall notices where needed
- Fire protection to the steel
- Making good, plastering and flooring repairs
How long does it take?
Build time is typically 1 to 2 weeks on site for a typical knock-through. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Bedworth
The West Midlands has large numbers of 1930s semis and Victorian terraces, which suit rear extensions, side extensions and dormer loft conversions.
Our Bedworth coverage includes postcode districts CV12, and we also work in nearby places such as Nuneaton, Coventry and Hinckley.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about structural alterations in Bedworth
How much does a structural alteration cost in Bedworth?
In Bedworth, a structural alteration typically costs £4,250–£9,250 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.
Who approves a structural alteration in Bedworth?
Planning matters in Bedworth go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.