SK Developments Free home visit0800 088 6248 Get a quote

LancashireStructural alterations and knock-throughs

Structural alterations and knock-throughs in Burnley

SK Developments builds structural alterations in Burnley, about 19 miles east of Preston. We look after the design, the planning or permitted development check, building control and the build itself.

Guide price in Burnley

£4,250–£9,000 for a typical knock-through with steel beam

In Burnley, a structural alteration typically costs £4,250–£9,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Burnley?

In Burnley, a structural alteration typically costs £4,250–£9,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Burnley. Design, structural calculations and council fees are extra.

Guide prices for Burnley, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£4,250–£9,000
Higher specification£9,000–£11,000

Your quote will depend mainly on:

  • Span of the opening
  • Moving radiators, sockets and pipes
  • Flush or downstand beam
  • Party wall involvement

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a structural alteration in Burnley?

The approval route for Burnley is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

What we take care of:

  • Structural engineer’s calculations and drawings
  • Building control sign-off
  • Making good, plastering and flooring repairs
  • Party wall notices where needed
  • Building control application
  • Fire protection to the steel

How long does it take?

Build time is typically 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Burnley

Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.

Burnley sits in Lancashire, about 19 miles east of Preston. We cover the whole of Burnley, including postcodes BB11.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about structural alterations in Burnley

How do I know if a wall is load-bearing?

Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.

Do I need building regulations approval?

Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.

What fire protection does a steel need?

Usually fire-rated plasterboard or intumescent paint, as building control requires.

How much does a structural alteration cost in Burnley?

In Burnley, a structural alteration typically costs £4,250–£9,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

How long does a structural alteration take in Burnley?

Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.

Start with a guide price, then book a free survey for a fixed quote in Burnley.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price