What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Grantham?
In Grantham, a structural alteration typically costs £4,250–£9,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). That range is adjusted for the East Midlands, where domestic building work typically costs around 5% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £4,250–£9,000 |
| Higher specification | £9,000–£11,000 |
Your quote will depend mainly on:
- Span of the opening
- What sits above the wall
- Party wall involvement
- Moving radiators, sockets and pipes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a structural alteration in Grantham?
Whether you need planning permission depends on your house and its location in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a structural alteration:
- Steel beam supply and installation on padstones
- Temporary propping
- Fire protection to the steel
- Party wall notices where needed
- Structural engineer’s calculations and drawings
- Building control application
How long does it take?
The build itself usually takes 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Grantham
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
We work across Grantham and neighbouring areas such as Newark on Trent, Melton Mowbray and Oakham. Postcodes we cover in Grantham include NG31.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about structural alterations in Grantham
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.
How much does a structural alteration cost in Grantham?
In Grantham, a structural alteration typically costs £4,250–£9,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
Do you build structural alterations in Grantham?
Yes. We build structural alterations across Grantham, including postcodes NG31. Every project starts with a free home visit.