What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Horley?
In Horley, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,000–£10,500 |
| Higher specification | £10,500–£13,000 |
The biggest cost drivers are:
- Span of the opening
- Party wall involvement
- Flush or downstand beam
- Floor and ceiling repairs
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a structural alteration in Horley?
Approvals for a structural alteration in Horley follow the rules for England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical structural alteration we handle:
- Steel beam supply and installation on padstones
- Making good, plastering and flooring repairs
- Party wall notices where needed
- Fire protection to the steel
- Building control sign-off
- Temporary propping
How long does it take?
The build itself usually takes 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Horley
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Horley sits in Surrey, about 18 miles east of Guildford. We cover the whole of Horley, including postcodes RH6.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about structural alterations in Horley
Do I need building regulations approval?
Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
Can the beam be hidden?
Often, by setting it within the ceiling depth. It depends on the joists and span.
Who approves a structural alteration in Horley?
Planning matters in Horley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a structural alteration cost in Horley?
In Horley, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.