What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Kettering?
In Kettering, a structural alteration typically costs £4,250–£9,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Building costs in the East Midlands run about 5% below the UK average, and the figures for Kettering are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £4,250–£9,000 |
| Higher specification | £9,000–£11,000 |
The main things that change the cost:
- Span of the opening
- Party wall involvement
- Flush or downstand beam
- Floor and ceiling repairs
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a structural alteration in Kettering?
The approval route for Kettering is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical structural alteration we handle:
- Fire protection to the steel
- Party wall notices where needed
- Steel beam supply and installation on padstones
- Building control application
- Structural engineer’s calculations and drawings
- Building control sign-off
How long does it take?
Expect 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Kettering
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
Our Kettering coverage includes postcode districts NN16, and we also work in nearby places such as Wellingborough, Corby and Rushden.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about structural alterations in Kettering
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
Who approves a structural alteration in Kettering?
Planning matters in Kettering go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
Do I need building regulations approval?
Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.
How much does a structural alteration cost in Kettering?
In Kettering, a structural alteration typically costs £4,250–£9,000 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
