What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Mill Hill?
In Mill Hill, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Mill Hill. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,750–£12,500 |
| Higher specification | £12,500–£15,500 |
The main things that change the cost:
- Moving radiators, sockets and pipes
- Party wall involvement
- Span of the opening
- Flush or downstand beam
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a structural alteration in Mill Hill?
The approval route for Mill Hill is set by planning law in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Steel beam supply and installation on padstones
- Structural engineer’s calculations and drawings
- Fire protection to the steel
- Party wall notices where needed
- Building control application
- Building control sign-off
How long does it take?
Build time is typically 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Mill Hill
Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.
If your home is in Mill Hill or close by in Edgware, Hendon and Finchley, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about structural alterations in Mill Hill
Who approves a structural alteration in Mill Hill?
Planning matters in Mill Hill go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a structural alteration cost in Mill Hill?
In Mill Hill, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.
How do I know if a wall is load-bearing?
Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.