SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonStructural alterations and knock-throughs

Structural alterations and knock-throughs in Streatham

SK Developments designs, gets approval for and builds structural alterations in Streatham and across Greater London, with one contract from the first drawing to the building control sign-off.

Guide price in Streatham

£5,750–£12,500 for a typical knock-through with steel beam

In Streatham, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Streatham?

In Streatham, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Building costs in London run about 30% above the UK average, and the figures for Streatham are adjusted to reflect that. Design, structural calculations and council fees are extra.

Guide prices for Streatham, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£5,750–£12,500
Higher specification£12,500–£15,500

Your quote will depend mainly on:

  • Span of the opening
  • Floor and ceiling repairs
  • Moving radiators, sockets and pipes
  • What sits above the wall

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a structural alteration in Streatham?

Approvals for a structural alteration in Streatham follow the rules for England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

On a typical structural alteration we handle:

  • Structural engineer’s calculations and drawings
  • Fire protection to the steel
  • Building control sign-off
  • Party wall notices where needed
  • Making good, plastering and flooring repairs
  • Building control application

How long does it take?

Expect 1 to 2 weeks on site for a typical knock-through. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in Streatham

Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.

We work across Streatham and neighbouring areas such as Balham, Tooting and Clapham. Postcodes we cover in Streatham include SW16.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about structural alterations in Streatham

Do I need building regulations approval?

Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.

Do I need a party wall notice?

In England and Wales, if the beam sits in a party wall, yes.

Do you build structural alterations in Streatham?

Yes. We build structural alterations across Streatham, including postcodes SW16. Every project starts with a free home visit.

What fire protection does a steel need?

Usually fire-rated plasterboard or intumescent paint, as building control requires.

How much does a structural alteration cost in Streatham?

In Streatham, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Ready to talk about a structural alteration in Streatham? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price