SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonStructural alterations and knock-throughs

Structural alterations and knock-throughs in Welling

SK Developments builds structural alterations in Welling, about 11 miles east of central London. We look after the design, the planning or permitted development check, building control and the build itself.

Guide price in Welling

£5,750–£12,500 for a typical knock-through with steel beam

In Welling, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Welling?

In Welling, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). The guide for Welling reflects typical costs in London, roughly 30% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Welling, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£5,750–£12,500
Higher specification£12,500–£15,500

The biggest cost drivers are:

  • Party wall involvement
  • Floor and ceiling repairs
  • What sits above the wall
  • Flush or downstand beam

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a structural alteration in Welling?

Whether you need planning permission depends on your house and its location in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

The work we manage on a structural alteration:

  • Structural engineer’s calculations and drawings
  • Making good, plastering and flooring repairs
  • Fire protection to the steel
  • Building control application
  • Steel beam supply and installation on padstones
  • Building control sign-off

How long does it take?

Allow 1 to 2 weeks on site for a typical knock-through. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.

Building in Welling

Victorian and Edwardian terraces dominate many London streets, which is why side return, wraparound and mansard projects are so common here.

Projects in Welling (DA16) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about structural alterations in Welling

What fire protection does a steel need?

Usually fire-rated plasterboard or intumescent paint, as building control requires.

How much does a structural alteration cost in Welling?

In Welling, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

Can the beam be hidden?

Often, by setting it within the ceiling depth. It depends on the joists and span.

Do you build structural alterations in Welling?

Yes. We build structural alterations across Welling, including postcodes DA16. Every project starts with a free home visit.

How long does a knock-through take?

Usually 1 to 2 weeks on site, plus a few days for plastering to dry.

Get a free, no-obligation home visit for your structural alteration in Welling.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price