SK Developments Free home visit0800 088 6248 Get a quote

Greater LondonStructural alterations and knock-throughs

Structural alterations and knock-throughs in Westminster

SK Developments builds structural alterations in Westminster, in central London. We look after the design, the planning or permitted development check, building control and the build itself.

Guide price in Westminster

£5,750–£12,500 for a typical knock-through with steel beam

In Westminster, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a structural alteration?

Steel beam installed across a wide opening with props in place during a knock-through

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.

How much does a structural alteration cost in Westminster?

In Westminster, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Westminster. Design, structural calculations and council fees are extra.

Guide prices for Westminster, including VAT at 20% (standard rate)
Size or typeGuide range
A typical knock-through with steel beam£5,750–£12,500
Higher specification£12,500–£15,500

The biggest cost drivers are:

  • Moving radiators, sockets and pipes
  • Span of the opening
  • Floor and ceiling repairs
  • What sits above the wall

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a structural alteration in Westminster?

Whether you need planning permission depends on your house and its location in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

From survey to sign-off, the job normally involves:

  • Fire protection to the steel
  • Structural engineer’s calculations and drawings
  • Building control application
  • Temporary propping
  • Making good, plastering and flooring repairs
  • Building control sign-off

How long does it take?

The build itself usually takes 1 to 2 weeks on site for a typical knock-through. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.

Building in Westminster

Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.

We work across Westminster and neighbouring areas such as Bermondsey, Brixton and Battersea. Postcodes we cover in Westminster include SW1.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about structural alterations in Westminster

How much does a structural alteration cost in Westminster?

In Westminster, a structural alteration typically costs £5,750–£12,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.

How do I know if a wall is load-bearing?

Only a survey can confirm it. Walls that carry floor joists, roof loads or walls above are load-bearing. We check on site and the engineer confirms.

Do I need building regulations approval?

Yes. Removing a load-bearing wall is building work that needs approval, with calculations for the beam.

Do I need a party wall notice?

In England and Wales, if the beam sits in a party wall, yes.

How long does a structural alteration take in Westminster?

Typically 1 to 2 weeks on site for a typical knock-through. Design and approvals beforehand usually take 6 to 12 weeks.

Ready to talk about a structural alteration in Westminster? Book a free home visit or get an instant guide price.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price