What is a structural alteration?

A structural alteration changes how a house carries its loads, most often by removing a load-bearing wall and replacing it with a steel beam. It is how kitchens and dining rooms become open-plan, and how extensions are joined to the original house.
How much does a structural alteration cost in Wokingham?
In Wokingham, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Building costs in the South East run about 12% above the UK average, and the figures for Wokingham are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| A typical knock-through with steel beam | £5,000–£10,500 |
| Higher specification | £10,500–£13,000 |
Your quote will depend mainly on:
- Party wall involvement
- Flush or downstand beam
- Moving radiators, sockets and pipes
- What sits above the wall
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a structural alteration in Wokingham?
Here is how the rules work for a structural alteration in England. In England removing a load-bearing wall does not need planning permission but does need building regulations approval with an engineer’s calculations. If the beam bears on a party wall, a party wall notice must be served.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical structural alteration we handle:
- Steel beam supply and installation on padstones
- Party wall notices where needed
- Fire protection to the steel
- Building control sign-off
- Structural engineer’s calculations and drawings
- Building control application
How long does it take?
Build time is typically 1 to 2 weeks on site for a typical knock-through. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Wokingham
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
From RG40 outwards, we take on projects throughout Wokingham and the surrounding parts of Berkshire.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about structural alterations in Wokingham
Who approves a structural alteration in Wokingham?
Planning matters in Wokingham go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a knock-through take?
Usually 1 to 2 weeks on site, plus a few days for plastering to dry.
Do I need a party wall notice?
In England and Wales, if the beam sits in a party wall, yes.
What fire protection does a steel need?
Usually fire-rated plasterboard or intumescent paint, as building control requires.
How much does a structural alteration cost in Wokingham?
In Wokingham, a structural alteration typically costs £5,000–£10,500 for a typical knock-through with steel beam, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.