Wraparound extensions in Camberley

We take on wraparound extensions in Camberley, about 10 miles north-west of Guildford, handling the drawings, approvals and construction so you deal with one company throughout.

Guide price in Camberley

£2,450–£3,600 per m² of floor area

In Camberley, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a wraparound extension?

L-shaped wraparound extension with a frameless glass corner and steel-look doors on a London terrace

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.

How much does a wraparound extension cost in Camberley?

In Camberley, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000. The guide for Camberley reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.

Guide prices for Camberley, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£49,000–£72,000
Typical project (28 m²)£68,500–£101,000
Larger project (39 m²)£95,500–£140,500
Rate per m²£2,450–£3,600

Your quote will depend mainly on:

  • Drainage changes
  • Total footprint and the amount of glazing
  • Steelwork and propping of the existing house
  • Access for materials on terraced streets

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a wraparound extension in Camberley?

Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

From survey to sign-off, the job normally involves:

  • Walls, roof and glazing
  • Structural engineer’s design for steels and supports
  • Party wall notices and surveyor liaison
  • Foundations and drainage
  • Underfloor heating option, electrics and plastering
  • Removal of internal and external walls

How long does it take?

Build time is typically 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Camberley

The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.

We work across Camberley and neighbouring areas such as Sandhurst, Farnborough and Crowthorne. Postcodes we cover in Camberley include GU15.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about wraparound extensions in Camberley

Is a wraparound worth it?

It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.

How much does a wraparound extension cost in Camberley?

In Camberley, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £68,500–£101,000. Your fixed price depends on the survey and drawings.

How long does it take to build?

Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.

Do you build wraparound extensions in Camberley?

Yes. We build wraparound extensions across Camberley, including postcodes GU15. Every project starts with a free home visit.

Does a wraparound extension need planning permission?

Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.

Ready to talk about a wraparound extension in Camberley? Book a free home visit or get an instant guide price.