SK Developments Free home visit0800 088 6248 Get a quote

DunbartonshireWraparound extensions

Wraparound extensions in Clydebank

SK Developments designs, gets approval for and builds wraparound extensions in Clydebank and across Dunbartonshire, with one contract from the first drawing to the building control sign-off.

Guide price in Clydebank

£2,150–£3,100 per m² of floor area

In Clydebank, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a wraparound extension?

L-shaped wraparound extension with a frameless glass corner and steel-look doors on a London terrace

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.

How much does a wraparound extension cost in Clydebank?

In Clydebank, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Building costs in Scotland are close to the UK average, so the figures for Clydebank are close to our national guide. Design, structural calculations and council fees are extra.

Guide prices for Clydebank, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£43,000–£62,000
Typical project (28 m²)£60,000–£87,000
Larger project (39 m²)£84,000–£121,000
Rate per m²£2,150–£3,100

Your quote will depend mainly on:

  • Agreements with neighbours on shared walls
  • Access for materials on terraced streets
  • Kitchen and flooring specification
  • Steelwork and propping of the existing house

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a wraparound extension in Clydebank?

Approvals for a wraparound extension in Clydebank follow the rules for Scotland. In Scotland a wraparound extension normally needs planning permission and a building warrant.

Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

Handled as part of most wraparound extensions:

  • Structural engineer’s design for steels and supports
  • Building control completion
  • Removal of internal and external walls
  • Underfloor heating option, electrics and plastering
  • Written agreement with neighbours on shared walls
  • Walls, roof and glazing

How long does it take?

Build time is typically 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Clydebank

Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.

We work across Clydebank and neighbouring areas such as Erskine, Renfrew and Bearsden. Postcodes we cover in Clydebank include G81.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about wraparound extensions in Clydebank

What about the old back addition?

The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.

How long does a wraparound extension take in Clydebank?

Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.

Do I need planning permission for a wraparound extension in Clydebank?

In Scotland a wraparound extension normally needs planning permission and a building warrant.

Is a wraparound worth it?

It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.

Can we keep a separate living room?

Yes. Many clients keep the front room separate and open up only the back of the house.

How much does a wraparound extension cost in Clydebank?

In Clydebank, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.

Tell us about your project in Clydebank and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price