What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Coalville?
In Coalville, a wraparound extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £59,000–£85,500. The guide for Coalville reflects typical costs in the East Midlands, roughly 5% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £42,000–£61,000 |
| Typical project (28 m²) | £59,000–£85,500 |
| Larger project (39 m²) | £82,000–£119,000 |
| Rate per m² | £2,100–£3,050 |
The main things that change the cost:
- Total footprint and the amount of glazing
- Kitchen and flooring specification
- Access for materials on terraced streets
- Drainage changes
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a wraparound extension in Coalville?
Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical wraparound extension we handle:
- Design and planning application
- Underfloor heating option, electrics and plastering
- Removal of internal and external walls
- Walls, roof and glazing
- Party wall notices and surveyor liaison
- Building control completion
How long does it take?
Expect 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Coalville
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
From LE67 outwards, we take on projects throughout Coalville and the surrounding parts of Leicestershire.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Coalville
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
How long does a wraparound extension take in Coalville?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much does a wraparound extension cost in Coalville?
In Coalville, a wraparound extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £59,000–£85,500. Your fixed price depends on the survey and drawings.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.