What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in East Grinstead?
In East Grinstead, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £68,500–£101,000. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £49,000–£72,000 |
| Typical project (28 m²) | £68,500–£101,000 |
| Larger project (39 m²) | £95,500–£140,500 |
| Rate per m² | £2,450–£3,600 |
Your quote will depend mainly on:
- Total footprint and the amount of glazing
- Drainage changes
- Kitchen and flooring specification
- Party wall surveyor fees for one or both neighbours
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a wraparound extension in East Grinstead?
Here is how the rules work for a wraparound extension in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Structural engineer’s design for steels and supports
- Building control completion
- Party wall notices and surveyor liaison
- Removal of internal and external walls
- Foundations and drainage
- Walls, roof and glazing
How long does it take?
Build time is typically 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in East Grinstead
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Our East Grinstead coverage includes postcode districts RH19, and we also work in nearby places such as Horley, Crawley and Crowborough.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in East Grinstead
How much does a wraparound extension cost in East Grinstead?
In East Grinstead, a wraparound extension typically costs £2,450–£3,600 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £68,500–£101,000. Your fixed price depends on the survey and drawings.
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
Who approves a wraparound extension in East Grinstead?
Planning matters in East Grinstead go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.