What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in the East Riding of Yorkshire?
In the East Riding of Yorkshire, a wraparound extension typically costs £2,050–£3,000 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £57,500–£84,000. That range is adjusted for Yorkshire and the Humber, where domestic building work typically costs around 7% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £41,000–£60,000 |
| Typical project (28 m²) | £57,500–£84,000 |
| Larger project (39 m²) | £80,000–£117,000 |
| Rate per m² | £2,050–£3,000 |
The biggest cost drivers are:
- Steelwork and propping of the existing house
- Party wall surveyor fees for one or both neighbours
- Total footprint and the amount of glazing
- Kitchen and flooring specification
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in the East Riding of Yorkshire?
Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Removal of internal and external walls
- Foundations and drainage
- Design and planning application
- Walls, roof and glazing
- Underfloor heating option, electrics and plastering
- Building control completion
How long does it take?
Build time is typically 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in the East Riding of Yorkshire
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
Towns we cover in the East Riding of Yorkshire include Hull, Bridlington, Beverley, Goole and Brough.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in the East Riding of Yorkshire
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
Do you build wraparound extensions in the East Riding of Yorkshire?
Yes. We build wraparound extensions across the East Riding of Yorkshire, including postcodes DN14, HU1, HU10, HU11 and HU12. Every project starts with a free home visit.
How much does a wraparound extension cost in the East Riding of Yorkshire?
In the East Riding of Yorkshire, a wraparound extension typically costs £2,050–£3,000 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £57,500–£84,000. Your fixed price depends on the survey and drawings.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.
