What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Farnworth?
In Farnworth, a wraparound extension typically costs £2,050–£3,000 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £57,500–£84,000. That range is adjusted for the North West, where domestic building work typically costs around 6% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £41,000–£60,000 |
| Typical project (28 m²) | £57,500–£84,000 |
| Larger project (39 m²) | £80,000–£117,000 |
| Rate per m² | £2,050–£3,000 |
Your quote will depend mainly on:
- Drainage changes
- Access for materials on terraced streets
- Total footprint and the amount of glazing
- Steelwork and propping of the existing house
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Farnworth?
The approval route for Farnworth is set by planning law in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a wraparound extension:
- Removal of internal and external walls
- Party wall notices and surveyor liaison
- Design and planning application
- Underfloor heating option, electrics and plastering
- Building control completion
- Structural engineer’s design for steels and supports
How long does it take?
Allow 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Farnworth
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Farnworth sits in Greater Manchester, about 8 miles north-west of Manchester. We cover the whole of Farnworth, including postcodes BL4.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Farnworth
How long does a wraparound extension take in Farnworth?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much does a wraparound extension cost in Farnworth?
In Farnworth, a wraparound extension typically costs £2,050–£3,000 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £57,500–£84,000. Your fixed price depends on the survey and drawings.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
