What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Heavitree?
In Heavitree, a wraparound extension typically costs £2,250–£3,250 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £63,000–£91,000. Prices in the South West sit near the national average for this kind of work, and the range for Heavitree reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £45,000–£65,000 |
| Typical project (28 m²) | £63,000–£91,000 |
| Larger project (39 m²) | £88,000–£127,000 |
| Rate per m² | £2,250–£3,250 |
The biggest cost drivers are:
- Party wall surveyor fees for one or both neighbours
- Kitchen and flooring specification
- Steelwork and propping of the existing house
- Access for materials on terraced streets
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a wraparound extension in Heavitree?
Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a wraparound extension:
- Building control completion
- Design and planning application
- Walls, roof and glazing
- Structural engineer’s design for steels and supports
- Foundations and drainage
- Removal of internal and external walls
How long does it take?
The build itself usually takes 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Heavitree
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Our Heavitree coverage includes postcode districts EX2 and EX4, and we also work in nearby places such as Exeter, Exmouth and Tiverton.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in Heavitree
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
How long does a wraparound extension take in Heavitree?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Heavitree?
In Heavitree, a wraparound extension typically costs £2,250–£3,250 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £63,000–£91,000. Your fixed price depends on the survey and drawings.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.