What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Hemel Hempstead?
In Hemel Hempstead, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £66,000–£95,000. Prices across the East of England are typically 6% above the UK average for this kind of work, which is reflected in the range for Hemel Hempstead. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £47,000–£68,000 |
| Typical project (28 m²) | £66,000–£95,000 |
| Larger project (39 m²) | £91,500–£132,500 |
| Rate per m² | £2,350–£3,400 |
The main things that change the cost:
- Drainage changes
- Total footprint and the amount of glazing
- Party wall surveyor fees for one or both neighbours
- Access for materials on terraced streets
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a wraparound extension in Hemel Hempstead?
The approval route for Hemel Hempstead is set by planning law in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most wraparound extensions:
- Structural engineer’s design for steels and supports
- Design and planning application
- Party wall notices and surveyor liaison
- Foundations and drainage
- Removal of internal and external walls
- Underfloor heating option, electrics and plastering
How long does it take?
Build time is typically 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Hemel Hempstead
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
Hemel Hempstead sits in Hertfordshire, about 16 miles west of Hertford. We cover the whole of Hemel Hempstead, including postcodes HP3.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in Hemel Hempstead
Who approves a wraparound extension in Hemel Hempstead?
Planning matters in Hemel Hempstead go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
How much does a wraparound extension cost in Hemel Hempstead?
In Hemel Hempstead, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £66,000–£95,000. Your fixed price depends on the survey and drawings.
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.