What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Hereford?
In Hereford, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £60,000–£87,000. Prices in the West Midlands sit near the national average for this kind of work, and the range for Hereford reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £43,000–£62,000 |
| Typical project (28 m²) | £60,000–£87,000 |
| Larger project (39 m²) | £84,000–£121,000 |
| Rate per m² | £2,150–£3,100 |
The biggest cost drivers are:
- Total footprint and the amount of glazing
- Steelwork and propping of the existing house
- Kitchen and flooring specification
- Access for materials on terraced streets
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a wraparound extension in Hereford?
The approval route for Hereford is set by planning law in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Design and planning application
- Removal of internal and external walls
- Underfloor heating option, electrics and plastering
- Building control completion
- Structural engineer’s design for steels and supports
- Foundations and drainage
How long does it take?
Allow 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Hereford
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
Hereford sits in Herefordshire. We cover the whole of Hereford, including postcodes HR1.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Hereford
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Hereford?
In Hereford, a wraparound extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £60,000–£87,000. Your fixed price depends on the survey and drawings.
How long does a wraparound extension take in Hereford?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.