What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Kettering?
In Kettering, a wraparound extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £59,000–£85,500. Prices across the East Midlands are typically 5% below the UK average for this kind of work, which is reflected in the range for Kettering. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £42,000–£61,000 |
| Typical project (28 m²) | £59,000–£85,500 |
| Larger project (39 m²) | £82,000–£119,000 |
| Rate per m² | £2,100–£3,050 |
What moves the price most:
- Party wall surveyor fees for one or both neighbours
- Drainage changes
- Kitchen and flooring specification
- Access for materials on terraced streets
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a wraparound extension in Kettering?
Approvals for a wraparound extension in Kettering follow the rules for England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Underfloor heating option, electrics and plastering
- Party wall notices and surveyor liaison
- Walls, roof and glazing
- Design and planning application
- Structural engineer’s design for steels and supports
- Building control completion
How long does it take?
The build itself usually takes 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Kettering
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
Our Kettering coverage includes postcode districts NN16, and we also work in nearby places such as Wellingborough, Corby and Rushden.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Kettering
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
How much does a wraparound extension cost in Kettering?
In Kettering, a wraparound extension typically costs £2,100–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £59,000–£85,500. Your fixed price depends on the survey and drawings.
Do you build wraparound extensions in Kettering?
Yes. We build wraparound extensions across Kettering, including postcodes NN16. Every project starts with a free home visit.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
