What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Limavady?
In Limavady, a wraparound extension typically costs £1,900–£2,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £53,000–£77,000. Building costs in Northern Ireland run about 14% below the UK average, and the figures for Limavady are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £38,000–£55,000 |
| Typical project (28 m²) | £53,000–£77,000 |
| Larger project (39 m²) | £74,000–£107,000 |
| Rate per m² | £1,900–£2,750 |
The main things that change the cost:
- Access for materials on terraced streets
- Steelwork and propping of the existing house
- Total footprint and the amount of glazing
- Drainage changes
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Limavady?
Here is how the rules work for a wraparound extension in Northern Ireland. In Northern Ireland a wraparound extension normally needs planning permission and building control approval.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Building control completion
- Structural engineer’s design for steels and supports
- Foundations and drainage
- Walls, roof and glazing
- Underfloor heating option, electrics and plastering
- Design and planning application
How long does it take?
Expect 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Limavady
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
From BT49 outwards, we take on projects throughout Limavady and the surrounding parts of County Londonderry.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about wraparound extensions in Limavady
Is a wraparound worth it?
It gives the biggest ground-floor space without going upwards. Whether it adds value depends on your street and house, so we suggest checking local sale prices before committing.
How much does a wraparound extension cost in Limavady?
In Limavady, a wraparound extension typically costs £1,900–£2,750 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £53,000–£77,000. Your fixed price depends on the survey and drawings.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
Do I need planning permission for a wraparound extension in Limavady?
In Northern Ireland a wraparound extension normally needs planning permission and building control approval.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
How long does a wraparound extension take in Limavady?
Typically 12 to 18 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
