What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Llandudno?
In Llandudno, a wraparound extension typically costs £2,000–£2,950 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £56,000–£82,500. We start from a UK-wide guide and adjust it for Wales, where labour and materials are typically about 8% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £40,000–£59,000 |
| Typical project (28 m²) | £56,000–£82,500 |
| Larger project (39 m²) | £78,000–£115,000 |
| Rate per m² | £2,000–£2,950 |
Your quote will depend mainly on:
- Access for materials on terraced streets
- Total footprint and the amount of glazing
- Party wall surveyor fees for one or both neighbours
- Kitchen and flooring specification
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a wraparound extension in Llandudno?
Before anything is built in Llandudno, we confirm which approvals apply in Wales. In Wales a wraparound extension combines side and rear elements; it can only be permitted development if each part meets the limits, so many need a householder planning application.
The Party Wall etc. Act 1996 applies in Wales, so notices must be served before work on a shared wall, on the boundary, or excavation close to a neighbour’s foundations.
We check this for your address before design work starts, so there are no surprises later.
What we handle
From survey to sign-off, the job normally involves:
- Structural engineer’s design for steels and supports
- Walls, roof and glazing
- Underfloor heating option, electrics and plastering
- Design and planning application
- Foundations and drainage
- Party wall notices and surveyor liaison
How long does it take?
Expect 12 to 18 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Llandudno
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Our Llandudno coverage includes postcode districts LL30, and we also work in nearby places such as Colwyn Bay, Rhyl and Bangor.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about wraparound extensions in Llandudno
Do I need planning permission for a wraparound extension in Llandudno?
In Wales a wraparound extension combines side and rear elements; it can only be permitted development if each part meets the limits, so many need a householder planning application.
Who approves a wraparound extension in Llandudno?
Planning matters in Llandudno go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
What about the old back addition?
The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.
How much does a wraparound extension cost in Llandudno?
In Llandudno, a wraparound extension typically costs £2,000–£2,950 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £56,000–£82,500. Your fixed price depends on the survey and drawings.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.
Will both neighbours be affected?
Usually only the neighbour on the side return side, but rear foundations near either boundary can trigger party wall notices.