EssexWraparound extensions

Wraparound extensions in Southend-on-Sea

Thinking about a wraparound extension in Southend-on-Sea? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in Southend-on-Sea

£2,350–£3,400 per m² of floor area

In Southend-on-Sea, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £66,000–£95,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a wraparound extension?

L-shaped wraparound extension with a frameless glass corner and steel-look doors on a London terrace

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.

How much does a wraparound extension cost in Southend-on-Sea?

In Southend-on-Sea, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £66,000–£95,000. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.

Guide prices for Southend-on-Sea, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£47,000–£68,000
Typical project (28 m²)£66,000–£95,000
Larger project (39 m²)£91,500–£132,500
Rate per m²£2,350–£3,400

The main things that change the cost:

  • Drainage changes
  • Party wall surveyor fees for one or both neighbours
  • Total footprint and the amount of glazing
  • Kitchen and flooring specification

Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.

Do you need planning permission for a wraparound extension in Southend-on-Sea?

Whether you need planning permission depends on your house and its location in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

At the survey we check your house’s planning history and any restrictions, and tell you which route applies.

What we handle

From survey to sign-off, the job normally involves:

  • Removal of internal and external walls
  • Design and planning application
  • Building control completion
  • Foundations and drainage
  • Structural engineer’s design for steels and supports
  • Underfloor heating option, electrics and plastering

How long does it take?

Expect 12 to 18 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Southend-on-Sea

Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.

Projects in Southend-on-Sea (SS1, SS22 and SS99) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Visit and measured survey

    A free visit to understand the project, check access and take measurements.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about wraparound extensions in Southend-on-Sea

What about the old back addition?

The side wall of the back addition is usually removed and replaced with a steel beam, so the old kitchen joins the new space.

How long does it take to build?

Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.

Do you build wraparound extensions in Southend-on-Sea?

Yes. We build wraparound extensions across Southend-on-Sea, including postcodes SS1, SS22 and SS99. Every project starts with a free home visit.

How much does a wraparound extension cost in Southend-on-Sea?

In Southend-on-Sea, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £66,000–£95,000. Your fixed price depends on the survey and drawings.

Does a wraparound extension need planning permission?

Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.

Ready to talk about a wraparound extension in Southend-on-Sea? Book a free home visit or get an instant guide price.