What is a wraparound extension?

A wraparound extension combines a side return and a rear extension into one L-shaped addition. It gives the largest possible ground floor, often creating an open-plan kitchen, dining and living space across the whole width of the house.
How much does a wraparound extension cost in Stanford-le-Hope?
In Stanford-le-Hope, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £66,000–£95,000. The guide for Stanford-le-Hope reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £47,000–£68,000 |
| Typical project (28 m²) | £66,000–£95,000 |
| Larger project (39 m²) | £91,500–£132,500 |
| Rate per m² | £2,350–£3,400 |
What moves the price most:
- Steelwork and propping of the existing house
- Party wall surveyor fees for one or both neighbours
- Access for materials on terraced streets
- Drainage changes
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a wraparound extension in Stanford-le-Hope?
The approval route for Stanford-le-Hope is set by planning law in England. In England a wraparound extension combines side and rear elements, which normally takes it outside permitted development, so a householder planning application is made.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most wraparound extensions:
- Party wall notices and surveyor liaison
- Removal of internal and external walls
- Walls, roof and glazing
- Underfloor heating option, electrics and plastering
- Building control completion
- Structural engineer’s design for steels and supports
How long does it take?
Expect 12 to 18 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Stanford-le-Hope
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Stanford-le-Hope sits in Essex, about 12 miles west of Southend-on-Sea. We cover the whole of Stanford-le-Hope, including postcodes SS17.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about wraparound extensions in Stanford-le-Hope
How much does a wraparound extension cost in Stanford-le-Hope?
In Stanford-le-Hope, a wraparound extension typically costs £2,350–£3,400 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £66,000–£95,000. Your fixed price depends on the survey and drawings.
Does a wraparound extension need planning permission?
Almost always. Combining side and rear elements usually goes beyond permitted development limits, so a householder planning application is normally made.
Can we keep a separate living room?
Yes. Many clients keep the front room separate and open up only the back of the house.
Do you build wraparound extensions in Stanford-le-Hope?
Yes. We build wraparound extensions across Stanford-le-Hope, including postcodes SS17. Every project starts with a free home visit.
How long does it take to build?
Around 12 to 18 weeks on site after approvals. Design, planning and party wall matters usually take 3 to 4 months beforehand.