SK Developments Free home visit0800 088 6248 Get a quote

GuideUpdated 25/10/2026

How do I build a new home on my plot?

Short answer

Start with a feasibility check of the plot, then design and planning permission, detailed design and building regulations, a structural warranty and finance, then the build itself, which typically takes 9 to 14 months on site. New homes are normally zero-rated for VAT.

1. Feasibility

Check access, services, ground conditions, trees, ecology and planning policy before spending on design.

2. Design and planning

Full planning permission is needed. Pre-application advice from the council can reduce risk.

3. Technical design

Building regulations drawings, structural design and energy calculations.

4. Warranty and finance

Mortgage lenders usually require a structural warranty. Self-build mortgages release funds in stages.

5. Build

Groundworks, superstructure, roof, windows, services and fit-out, with inspections throughout. See our new build service and guide cost of £2,000–£3,200 per m² of floor area (build cost).

Sources and further reading

This guide is general information, not legal or tax advice. Rules change and depend on your property; we confirm what applies to your project at the survey.

More guides

Start with a free home visit

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price