What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Gravesend?
In Gravesend, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). We start from a UK-wide guide and adjust it for the South East, where labour and materials are typically about 12% above average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,750–£5,000 |
| Larger or more complex projects | £5,000–£6,250 |
The main things that change the cost:
- Project size and complexity
- Planning or building regulations stage
- Structural engineer’s fees
- 3D visuals
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Planning and building regulations in Gravesend
Here is how the rules work for a set of architectural drawings in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Measured survey of the existing house
- Building regulations drawings and specification
- 3D views on request
- Structural calculations coordinated
- Planning drawings: plans, elevations, site and location plans
- Party wall drawings where needed
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Gravesend
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
We work across Gravesend and neighbouring areas such as Grays, Strood and South Ockendon. Postcodes we cover in Gravesend include DA12.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Submission and follow-up
We submit the application and deal with questions from the council or building control.
Questions about architectural drawings in Gravesend
Do you prepare structural calculations?
We coordinate a chartered structural engineer for calculations and beam designs.
How much does a set of architectural drawings cost in Gravesend?
In Gravesend, a set of architectural drawings typically costs £1,750–£5,000 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
What are building regulations drawings?
More detailed drawings and specifications showing structure, insulation, fire safety, drainage and ventilation, used for building control approval and pricing.
Do you prepare architectural drawings in Gravesend?
Yes. We prepare architectural drawings across Gravesend, including postcodes DA12. Every project starts with a free home visit.
How long do drawings take?
Typically 2 to 6 weeks from survey, depending on revisions.