A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Gravesend?
In Gravesend, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £44,000–£65,000. Building costs in the South East run about 12% above the UK average, and the figures for Gravesend are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £31,000–£45,500 |
| Typical project (20 m²) | £44,000–£65,000 |
| Larger project (28 m²) | £61,500–£91,000 |
| Rate per m² | £2,200–£3,250 |
The main things that change the cost:
- Floor area and the length of new wall
- How much of the existing house is opened up
- Roof type and the size of any lantern or roof windows
- Kitchen, flooring and finishes, which we can include or leave to you
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Gravesend?
Here is how the rules work for a single-storey extension in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Structural calculations for steels and lintels
- Cavity walls, insulation and roof to current building regulations
- Measured survey and design drawings
- Building control inspections and completion certificate
- Foundations, drainage and any build-over agreement
- First and second fix electrics, heating and plastering
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Gravesend
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Our Gravesend coverage includes postcode districts DA12, and we also work in nearby places such as Grays, Strood and South Ockendon.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Gravesend
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
How much does a single-storey extension cost in Gravesend?
In Gravesend, a single-storey extension typically costs £2,200–£3,250 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £44,000–£65,000. Your fixed price depends on the survey and drawings.
Do you build single-storey extensions in Gravesend?
Yes. We build single-storey extensions across Gravesend, including postcodes DA12. Every project starts with a free home visit.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.