What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Heavitree?
In Heavitree, a set of architectural drawings typically costs £1,500–£4,500 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Building costs in the South West are close to the UK average, so the figures for Heavitree are close to our national guide. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,500–£4,500 |
| Larger or more complex projects | £4,500–£5,500 |
The biggest cost drivers are:
- Measured survey complexity
- 3D visuals
- Structural engineer’s fees
- Project size and complexity
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Heavitree
Whether you need planning permission depends on your house and its location in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a set of architectural drawings:
- Building regulations drawings and specification
- Party wall drawings where needed
- Tender-ready drawing pack
- Design options and sketch layouts
- Planning drawings: plans, elevations, site and location plans
- Structural calculations coordinated
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Heavitree
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
Projects in Heavitree (EX2 and EX4) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about architectural drawings in Heavitree
How much does a set of architectural drawings cost in Heavitree?
In Heavitree, a set of architectural drawings typically costs £1,500–£4,500 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
What drawings are needed for planning?
Usually existing and proposed floor plans and elevations, a block plan and a location plan. Some councils need more.
Can I use the drawings with another builder?
Yes. Drawings you pay for are yours to use for the project.
Do you prepare structural calculations?
We coordinate a chartered structural engineer for calculations and beam designs.
Do you prepare architectural drawings in Heavitree?
Yes. We prepare architectural drawings across Heavitree, including postcodes EX2 and EX4. Every project starts with a free home visit.