What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Morley?
In Morley, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). That range is adjusted for Yorkshire and the Humber, where domestic building work typically costs around 7% below the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,500–£4,250 |
| Larger or more complex projects | £4,250–£5,250 |
Your quote will depend mainly on:
- Project size and complexity
- Planning or building regulations stage
- Measured survey complexity
- Structural engineer’s fees
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Morley
Here is how the rules work for a set of architectural drawings in England. In England drawings are prepared to suit the local planning authority’s validation list and, later, building control.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most architectural drawings:
- Measured survey of the existing house
- Structural calculations coordinated
- Tender-ready drawing pack
- Design options and sketch layouts
- Planning drawings: plans, elevations, site and location plans
- Building regulations drawings and specification
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Morley
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
Morley sits in West Yorkshire, about 4 miles south-west of Leeds. We cover the whole of Morley, including postcodes LS27.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about architectural drawings in Morley
Do you prepare architectural drawings in Morley?
Yes. We prepare architectural drawings across Morley, including postcodes LS27. Every project starts with a free home visit.
Can I use the drawings with another builder?
Yes. Drawings you pay for are yours to use for the project.
Do you prepare structural calculations?
We coordinate a chartered structural engineer for calculations and beam designs.
How much does a set of architectural drawings cost in Morley?
In Morley, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
How long do drawings take?
Typically 2 to 6 weeks from survey, depending on revisions.