What is an orangery?

An orangery is an extension with brick or block piers, large areas of glazing and a solid perimeter roof around a central roof lantern. It sits between a conservatory and a traditional extension: brighter than an extension, warmer and more private than a conservatory.
How much does an orangery cost in Morley?
In Morley, an orangery typically costs £2,250–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 16 m² project that is roughly £36,000–£50,500. The guide for Morley reflects typical costs in Yorkshire and the Humber, roughly 7% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (11 m²) | £25,000–£34,500 |
| Typical project (16 m²) | £36,000–£50,500 |
| Larger project (22 m²) | £49,500–£69,500 |
| Rate per m² | £2,250–£3,150 |
What moves the price most:
- Size and shape of the footprint
- Heating and flooring
- Amount and type of glazing
- Frame material and colour
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for an orangery in Morley?
The approval route for Morley is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical orangery we handle:
- Building control sign-off where required
- Design to suit the style of the house
- French, sliding or bifold doors
- Foundations and dwarf walls or piers
- Flooring and decoration options
- Electrics, heating and plastering
How long does it take?
Expect 8 to 12 weeks on site. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Morley
In Yorkshire, through-terraces and back-to-backs have particular constraints, while semis and detached houses suit larger extensions.
If your home is in Morley or close by in Dewsbury, Lofthouse and Ossett, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about orangeries in Morley
How much does an orangery cost in Morley?
In Morley, an orangery typically costs £2,250–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 16 m² project comes to roughly £36,000–£50,500. Your fixed price depends on the survey and drawings.
What is the difference between an orangery and a conservatory?
An orangery has a solid roof around a central lantern and more brickwork, while a conservatory is mostly glazed. Orangeries are usually warmer in winter and cooler in summer.
Does an orangery need building regulations approval?
If it is open to the house or does not meet the conservatory exemption, yes. Most orangeries are treated as extensions and need building control approval, which we arrange.
How long does it take?
Typically 8 to 12 weeks on site once approvals are in place.
Who approves an orangery in Morley?
Planning matters in Morley go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
