What is a set of architectural drawings?

Architectural design turns your ideas into drawings that a council and a builder can work from. It starts with a measured survey of the house, then design options, planning drawings and, once approved, detailed building regulations drawings and specifications.
How much does a set of architectural drawings cost in Oban?
In Oban, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Planning and building regulations drawings for a typical extension | £1,500–£4,250 |
| Larger or more complex projects | £4,250–£5,250 |
Your quote will depend mainly on:
- Measured survey complexity
- Structural engineer’s fees
- 3D visuals
- Planning or building regulations stage
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Oban
Approvals for a set of architectural drawings in Oban follow the rules for Scotland. In Scotland drawings are prepared for the planning application and the building warrant, which must be granted before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a set of architectural drawings:
- Tender-ready drawing pack
- Written agreement with neighbours on shared walls
- Planning drawings: plans, elevations, site and location plans
- Design options and sketch layouts
- 3D views on request
- Building regulations drawings and specification
How long does it take?
Allow 2 to 6 weeks for drawings, depending on complexity. If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Oban
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Projects in Oban are taken on by arrangement. We confirm availability first, and any travel or accommodation costs are shown separately in the quote.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about architectural drawings in Oban
What drawings are needed for planning?
Usually existing and proposed floor plans and elevations, a block plan and a location plan. Some councils need more.
How long do drawings take?
Typically 2 to 6 weeks from survey, depending on revisions.
How much does a set of architectural drawings cost in Oban?
In Oban, a set of architectural drawings typically costs £1,500–£4,250 for planning and building regulations drawings for a typical extension, including VAT at 20% (standard rate). Your fixed price depends on the survey and drawings.
Do you prepare architectural drawings in Oban?
Yes. We prepare architectural drawings across Oban, including postcodes PA34. Every project starts with a free home visit.
Can I use the drawings with another builder?
Yes. Drawings you pay for are yours to use for the project.
