What is a new build home?

A new build home is a house built from the ground up on a cleared plot, a garden plot or a replacement-dwelling site. We work with plot owners and self-builders to design, gain approvals and build the house, either to a fixed design or from initial ideas.
How much does a new build home cost in Oban?
In Oban, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). For a typical 150 m² project that is roughly £292,500–£465,000. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £205,000–£325,500 |
| Typical project (150 m²) | £292,500–£465,000 |
| Larger project (210 m²) | £409,500–£651,000 |
| Rate per m² | £1,950–£3,100 |
What moves the price most:
- Services connections
- Site access and demolition
- External works and landscaping
- Specification and energy systems
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a new build home in Oban?
The approval route for Oban is set by planning law in Scotland. In Scotland a new home needs planning permission and a building warrant before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most new build homes:
- Internal fit-out and finishes
- Mechanical and electrical installation
- Superstructure, roof and windows
- Groundworks, foundations and drainage
- Structural and services design
- Building control completion and warranty liaison
How long does it take?
The build itself usually takes 9 to 14 months on site for a typical house. Allow time beforehand for drawings and approvals, usually 4 to 9 months.
Building in Oban
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Projects in Oban are taken on by arrangement. We confirm availability first, and any travel or accommodation costs are shown separately in the quote.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about new build homes in Oban
Is VAT charged on building a new house?
Construction services for a new dwelling are normally zero-rated when supplied by a VAT-registered builder. Self-builders who buy materials directly can reclaim VAT through HMRC’s DIY housebuilders scheme.
How much does a new build home cost in Oban?
In Oban, a new build home typically costs £1,950–£3,100 per m² of floor area (build cost), including VAT at 0% (zero-rated for qualifying new dwellings). A typical 150 m² project comes to roughly £292,500–£465,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a new build home in Oban?
In Scotland a new home needs planning permission and a building warrant before work starts.
Who approves a new build home in Oban?
Planning matters in Oban go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Can you build to my architect’s design?
Yes. We price and build from your drawings, or we can manage the design for you.
How long does a new build take?
A typical house takes 9 to 14 months on site after approvals.