What is a barn conversion?

A barn conversion turns an agricultural or rural building into a home while keeping its character: the brick or stone walls, roof timbers and large openings. It involves structural repair, insulation, new services and often a new floor slab.
How much does a barn conversion cost in Godalming?
In Godalming, a barn conversion typically costs £2,000–£3,350 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £300,000–£502,500. The guide for Godalming reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £210,000–£352,000 |
| Typical project (150 m²) | £300,000–£502,500 |
| Larger project (210 m²) | £420,000–£703,500 |
| Rate per m² | £2,000–£3,350 |
What moves the price most:
- Glazing and finishes
- Access to the site
- Services and drainage
- Planning conditions and ecology
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a barn conversion in Godalming?
Before anything is built in Godalming, we confirm which approvals apply in England. In England converting an agricultural building into a home needs either full planning permission or prior approval under Class Q of the permitted development rules, which limits floor space and the number of homes. Listed barns also need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most barn conversions:
- Services, drainage and septic or treatment plant
- Insulation that respects the existing fabric
- Structural survey and feasibility
- Building control completion
- Planning or prior approval application
- Structural repairs and new floor slab
How long does it take?
Build time is typically 6 to 12 months on site depending on condition. Before that, surveys, drawings and approvals usually take 4 to 9 months, longer if the council asks for changes.
Building in Godalming
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Godalming sits in Surrey, about 4 miles south-west of Guildford. We cover the whole of Godalming, including postcodes GU7.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about barn conversions in Godalming
Do you build barn conversions in Godalming?
Yes. We build barn conversions across Godalming, including postcodes GU7. Every project starts with a free home visit.
Do I need planning permission for a barn conversion?
Yes. A barn conversion needs planning permission or, in England only, prior approval under the agricultural permitted development rules where the building qualifies. Listed barns also need listed building consent.
How much does a barn conversion cost in Godalming?
In Godalming, a barn conversion typically costs £2,000–£3,350 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). A typical 150 m² project comes to roughly £300,000–£502,500. Your fixed price depends on the survey and drawings.
How long does a barn conversion take?
Typically 6 to 12 months on site, depending on the building’s condition.
What about drainage without mains sewer?
A sewage treatment plant can be installed, subject to the environmental regulator’s rules where you live.
