What is a barn conversion?

A barn conversion turns an agricultural or rural building into a home while keeping its character: the brick or stone walls, roof timbers and large openings. It involves structural repair, insulation, new services and often a new floor slab.
How much does a barn conversion cost in Hove?
In Hove, a barn conversion typically costs £2,000–£3,350 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). For a typical 150 m² project that is roughly £300,000–£502,500. The guide for Hove reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (105 m²) | £210,000–£352,000 |
| Typical project (150 m²) | £300,000–£502,500 |
| Larger project (210 m²) | £420,000–£703,500 |
| Rate per m² | £2,000–£3,350 |
What moves the price most:
- Access to the site
- Condition of the existing structure
- Insulation approach
- Planning conditions and ecology
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a barn conversion in Hove?
Here is how the rules work for a barn conversion in England. In England converting an agricultural building into a home needs either full planning permission or prior approval under Class Q of the permitted development rules, which limits floor space and the number of homes. Listed barns also need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a barn conversion:
- Building control completion
- New roof covering where needed
- Planning or prior approval application
- Structural repairs and new floor slab
- Insulation that respects the existing fabric
- Ecology and bat survey coordination
How long does it take?
Build time is typically 6 to 12 months on site depending on condition. Design and approvals come first and typically take 4 to 9 months, depending on the approval route.
Building in Hove
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
Projects in Hove (BN3) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about barn conversions in Hove
Can I get a mortgage for a barn conversion?
Specialist self-build and conversion mortgages release money in stages. We can provide the staged costings lenders ask for.
Is VAT reduced on a barn conversion?
Usually yes. Converting a non-residential building into a dwelling normally qualifies for the reduced 5% VAT rate on building work. Our guide prices assume this rate.
Do I need a bat survey?
Very often. Barns are common bat roosts, and planning authorities usually ask for an ecology survey.
How much does a barn conversion cost in Hove?
In Hove, a barn conversion typically costs £2,000–£3,350 per m² of floor area, including VAT at usually 5% (reduced rate for creating a new dwelling). A typical 150 m² project comes to roughly £300,000–£502,500. Your fixed price depends on the survey and drawings.
How long does a barn conversion take in Hove?
Typically 6 to 12 months on site depending on condition. Design and approvals beforehand usually take 4 to 9 months.
